MANUFACTURING JOURNEY // ATLAS

Our Manufacturing Workflow

From confirmed requirements and AutoCAD design to engineering, complete assembly, testing, packing, and shipment.

ORDER // CONFIRMED ENGINEERING // FLOW MAP NOORI // PRODUCTION PATH STATUS // LIVE JOURNEY
START // ORDER00

Order Confirmed

Requirements and technical discussions are finalized.

01 // CAD01

CAD Design

AutoCAD drawings and machine design are prepared.

02 // ENGINEERING02

Engineering

Responsible line engineer coordinates the project.

03 // FABRICATION03

Manufacturing

Machine and required parts move through production.

04 // ASSEMBLY04

Assembly

Manufactured components are integrated into the machine.

05 // TEST05

Test Run

Complete assembly is prepared for operational verification.

06 // DISPATCH06

Shipment

Packed machine is prepared for dispatch.

PROJECT FLOW // ORDER CONFIRMED

DEEP DIVE // STAGE CONTROL

From Design to Shipment

Each stage connects the confirmed project requirements to the next engineering and production handoff.

STAGE // 01

AutoCAD Drawing & Design

After order confirmation, the engineering team completes the AutoCAD drawings and machine design according to the requirements and technical discussions finalized during confirmation.

  • Order confirmation and requirement review
  • Technical discussions and finalized requirements
  • AutoCAD drawing and machine design preparation
Typical drawing/design procedure: 2–7 days. Actual duration can depend on project complexity and requirements.
AUTOCAD // MACHINE GEOMETRY

STAGE // 02

Engineering & Project Handling

Once the drawings are completed, the project is forwarded to the responsible line engineer who handles and coordinates the project throughout the manufacturing process.

  • Completed drawings handed to the responsible line engineer
  • Project coordination through manufacturing
  • Engineering handling remains connected to the production path
Responsible Line Engineer
CADLINE ENGINEERPROJECT HANDLING

STAGE // 03

Manufacturing

The machine and its required parts are manufactured according to the finalized design and the requirements established during order confirmation.

  • Manufacturing follows the finalized machine design
  • Required machine parts are produced as part of the project
  • Production progresses under the responsible project handling
MACHINE + REQUIRED PARTS

STAGE // 04

Complete Machine Assembly

After the machine and its required parts are completely manufactured, the components are brought together and the machine is assembled completely in preparation for a test run.

  • Manufactured parts are brought together
  • Components are integrated into the complete machine
  • The assembled machine is prepared for testing
PART APART BPART CPART DCOMPLETE MACHINE

STAGE // 05

Test Run

The complete machine is prepared for a test run to verify operation and observe performance before it moves to packing.

  • Complete machine assembly precedes the test run
  • Operational verification is performed before packing
  • The machine moves forward after the test-run stage
TEST RUN // OPERATIONAL VERIFICATIONSTATUS // OBSERVE

STAGE // 06

Packing

After the test run is completed, the machine is packed partially or as a whole depending on the machine type and transportation requirements.

  • Packing follows completion of the test run
  • Partial or complete packing may be used
  • Packing approach depends on machine type and transportation requirements
PARTIAL / COMPLETE PACKING

STAGE // 07

Shipment

The final packed machine is prepared for shipment and dispatch.

  • Final packed-machine preparation
  • Shipment readiness and dispatch preparation
READY FOR SHIPMENT
PACKED MACHINEREADY FOR SHIPMENT

COMPLETE JOURNEY // SUMMARY

Order to Shipment

00
ORDERConfirmed
01
CADDesign
02
ENGINEERINGHandling
03
MANUFACTURINGProduction
04
ASSEMBLYIntegration
05
TESTRun
06
SHIPMENTReady

Ready to Discuss Your Machine Project?

Use the existing enquiry channel to discuss your machinery requirements with Noori Engineering Industries.